Home > News > Blow Molding Machine Safety Operation Rules

Blow Molding Machine Safety Operation Rules

2022-02-25

Here are some Safety operation rules for Blow molding machine:

<1> Before starting each shift, add lubricating oil to each moving part. (manipulator, manipulator guide rail, mold opening and closing guide rail)

<2> The swing arm 3-4 days/time. The large chain and small chain of the heating machine one time/month. Always check whether the main engine reducer and the heating machine reducer are short of oil. The main engine bearing can be every 3 months per time.

The above suggestions are only for semi-autimatic blow molding machine. The automatic blow molding machine has automatic lubrication oil device.

<3> Before production, check whether the moving parts are firm, whether the screws are loose or falling off, especially in places with strong impact force, and whether the belt transmission part is abnormal.

<4> When start machine, start motor first, after 30 seconds to start the heating part to prevent voltage fluctuations.Turn on cooling water before starting the heating.

<5> Check whether each emergency stop switch, safety door switch, and detection switch of the protection device are normal.

<6> Check the peform in, preform out and insert preform part.

<7> Check whether the lamp tube damages or breaks. Change it in time.

<8> Check whether each pneumatic component is leaking and whether the action is sensitive.

<9> Check whether the triplet abnormally leaks and blocks.

<10> Clean solenoid valve if abnormal.

<11> Clean and polish blowing mold regularly.

<12> To prevent the dirt blowing into valve, you must move slowly when opening the high and low pressure air source switch. At the same time, open the exhaust valve for 30 seconds to ensure air is clean.

<13> When starting the fully automatic blow molding machine, make sure that the mechanical parts are in good condition, no person and no foreign matter inside. Close the safety door.

<14> Check high-pressure air source, low-pressure air source, power supply and water source.

<15> After starting heater 2-3 minutes, oven temperature rises evenly. Press the preform in button.

Blow Molding Machine Blow Molding Machine


Home > News > Blow Molding Machine Safety Operation Rules
Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send